Chargers by car model

A home charger for the Dacia Spring

The Dacia Spring has a single-phase 6.6 or 7 kW charger, so on a three-phase 11 kW wallbox it charges at 3.7 kW, the same as on a 16 A heavy-duty socket. The battery is small: Dacia gives about 6 h 50 min from 20 to 100% at 16 A.

Updated: November 17, 2026
A wall charger and an enclosure with a MID meter

How much power the Dacia Spring takes

Version
On-board charger (AC)
On an 11 kW wallbox
Battery
Spring Electric 45 (2021–2024)
6.6 kW, single-phase
3.7 kW
26.8 kWh
Spring 45 / 65, facelift (2024–2025)
7 kW, single-phase
3.7 kW
26.8 kWh
Spring 70 / 100 (from October 2025)
7 kW, single-phase
3.7 kW
24.3 kWh

A single-phase on-board charger uses one phase. WALLBOX 11 kW is three-phase, 16 A per phase, so such a car takes 3.7 kW at most on it.

In the Dacia Serbia catalog of March 2026, the Mode 3 cable (Type 2, for wallboxes and public chargers) is standard on the Expression trim, and the portable charger for a socket (Mode 2, 10 A) is a paid option.

With a 10 A portable charger the car charges at 2.3 kW: for the Spring 70 / 100, Dacia gives 10 h 11 min from 20 to 100%. The Spring takes its full 7 kW only on a single-phase 32 A charger.

DC fast charging is a paid option on most trims: up to 30 kW on older versions and up to 40 kW on the Spring from October 2025.

How long charging takes at home

Version
WALLBOX 11 kW
START, 3.7 kW
START, 2.3 kW
Spring Electric 45
about 8 h
about 8 h
about 13 h
Spring 45 / 65, facelift
about 8 h
about 8 h
about 13 h
Spring 70 / 100
about 7 h
about 7 h
about 12 h

The times are our own calculation for charging from 0 to 100%: battery capacity plus 10% losses, divided by the power. Charging slows down toward the end, and losses are higher on a socket (ADAC measured 12.7–24.2% at 2.3 kW and 5.1–7.0% on an 11 kW wallbox), so the real time can be longer.

START is a heavy-duty socket on its own circuit, with a MID meter: the car charges through its portable charger, at 2.3 kW (10 A) or 3.7 kW (16 A), depending on the portable charger.

Manufacturer’s figures. Spring Electric 45, 0–100%: 2.3 kW — 13 h 32 min, 3.7 kW — 8 h 28 min, 7.4 kW — 4 h 51 min. Spring 45 / 65, facelift, 20–100%: 2.3 kW — 10 h 50 min, 3.7 kW — 6 h 50 min, 7.4 kW — 4 h. Spring 70 / 100, 20–100%: 2.3 kW — 10 h 11 min, 3.7 kW — 6 h 47 min, 7.4 kW — 3 h 20 min.

What a full battery costs at night

A night kWh in the blue zone costs about 6 RSD with all fees and taxes — 5.70 RSD to be exact, under the EPS price list in force since October 1, 2025.

Version
Cost at night
From the grid for a full battery
Spring Electric 45
about 170 RSD
about 29 kWh
Spring 45 / 65, facelift
about 170 RSD
about 29 kWh
Spring 70 / 100
about 150 RSD
about 27 kWh

The price applies with a dual-tariff meter and consumption in the blue zone; in the red zone, above 1.200 kWh a month, a kWh costs more. On fast public chargers, receipts from August and September 2026 put a kWh at 43 to 79 RSD.

How much charging adds to the monthly bill is covered in the guide how much an electric car adds to your electricity bill.

Which package fits

For the Spring, START is the logical choice: it gives the same speed as an 11 kW wallbox, and the battery fills up in one night. The condition is a portable charger for the socket, which is a paid option on a new car. WALLBOX has its own cable, so you don’t need the portable charger; choose WALLBOX too if you plan on another, bigger car.

The package price is final and includes the charger and basic installation next to the distribution board: up to 2 m of cable, an RCD (FID) and a circuit breaker. If your spot is farther from the board, the cable and other work are priced at the assessment, before any work starts.

Package
Price
What you get
START
39.000 RSD
a heavy-duty socket with a MID meter, 2.3–3.7 kW
WALLBOX 11 kW
from 94.000 RSD
Iocharger 11 kW, 5 m cable; with a MID meter 104.000 RSD
ZGRADA
from 96.000 RSD per space
2–6 spaces at once, MID metering for every user
Installation only
from 24.000 RSD
we install a charger you already have

Wallbox Plus (from 115.000 RSD) and Wallbox Premium (155.000 RSD) are described under packages and prices.

Prices, trims and range for the Dacia Spring in Serbia are on the model page.

FAQ

Why does a Dacia Spring charge at 3.7 kW on an 11 kW wallbox?

Because the on-board charger is single-phase. A three-phase 11 kW wallbox delivers 16 A per phase, and the Spring uses one phase: 230 V × 16 A is about 3.7 kW.

What do I need to charge a Dacia Spring from a heavy-duty socket?

A portable charger (Mode 2). In the Dacia Serbia catalog of March 2026 it is a paid option, and what comes standard is the Mode 3 cable for wallboxes and public chargers. A 10 A portable charger charges at 2.3 kW, a 16 A one at 3.7 kW.

How much does it cost to install a charger for a Dacia Spring?

START is 39.000 RSD, and WALLBOX 11 kW starts at 94.000 RSD (104.000 RSD with a MID meter). The price is final and includes basic installation next to the distribution board; anything beyond that is priced after the assessment.

A charger for your Dacia Spring

Send photos of the distribution board and the spot for the charger — a rough estimate from photos is free, and we reply within 48 hours.

Send a request