A home charger for the Dacia Spring
The Dacia Spring has a single-phase 6.6 or 7 kW charger, so on a three-phase 11 kW wallbox it charges at 3.7 kW, the same as on a 16 A heavy-duty socket. The battery is small: Dacia gives about 6 h 50 min from 20 to 100% at 16 A.

How much power the Dacia Spring takes
A single-phase on-board charger uses one phase. WALLBOX 11 kW is three-phase, 16 A per phase, so such a car takes 3.7 kW at most on it.
In the Dacia Serbia catalog of March 2026, the Mode 3 cable (Type 2, for wallboxes and public chargers) is standard on the Expression trim, and the portable charger for a socket (Mode 2, 10 A) is a paid option.
With a 10 A portable charger the car charges at 2.3 kW: for the Spring 70 / 100, Dacia gives 10 h 11 min from 20 to 100%. The Spring takes its full 7 kW only on a single-phase 32 A charger.
DC fast charging is a paid option on most trims: up to 30 kW on older versions and up to 40 kW on the Spring from October 2025.
How long charging takes at home
The times are our own calculation for charging from 0 to 100%: battery capacity plus 10% losses, divided by the power. Charging slows down toward the end, and losses are higher on a socket (ADAC measured 12.7–24.2% at 2.3 kW and 5.1–7.0% on an 11 kW wallbox), so the real time can be longer.
START is a heavy-duty socket on its own circuit, with a MID meter: the car charges through its portable charger, at 2.3 kW (10 A) or 3.7 kW (16 A), depending on the portable charger.
Manufacturer’s figures. Spring Electric 45, 0–100%: 2.3 kW — 13 h 32 min, 3.7 kW — 8 h 28 min, 7.4 kW — 4 h 51 min. Spring 45 / 65, facelift, 20–100%: 2.3 kW — 10 h 50 min, 3.7 kW — 6 h 50 min, 7.4 kW — 4 h. Spring 70 / 100, 20–100%: 2.3 kW — 10 h 11 min, 3.7 kW — 6 h 47 min, 7.4 kW — 3 h 20 min.
What a full battery costs at night
A night kWh in the blue zone costs about 6 RSD with all fees and taxes — 5.70 RSD to be exact, under the EPS price list in force since October 1, 2025.
The price applies with a dual-tariff meter and consumption in the blue zone; in the red zone, above 1.200 kWh a month, a kWh costs more. On fast public chargers, receipts from August and September 2026 put a kWh at 43 to 79 RSD.
How much charging adds to the monthly bill is covered in the guide how much an electric car adds to your electricity bill.
Which package fits
For the Spring, START is the logical choice: it gives the same speed as an 11 kW wallbox, and the battery fills up in one night. The condition is a portable charger for the socket, which is a paid option on a new car. WALLBOX has its own cable, so you don’t need the portable charger; choose WALLBOX too if you plan on another, bigger car.
The package price is final and includes the charger and basic installation next to the distribution board: up to 2 m of cable, an RCD (FID) and a circuit breaker. If your spot is farther from the board, the cable and other work are priced at the assessment, before any work starts.
Wallbox Plus (from 115.000 RSD) and Wallbox Premium (155.000 RSD) are described under packages and prices.
Prices, trims and range for the Dacia Spring in Serbia are on the model page.
FAQ
Why does a Dacia Spring charge at 3.7 kW on an 11 kW wallbox?
Because the on-board charger is single-phase. A three-phase 11 kW wallbox delivers 16 A per phase, and the Spring uses one phase: 230 V × 16 A is about 3.7 kW.
What do I need to charge a Dacia Spring from a heavy-duty socket?
A portable charger (Mode 2). In the Dacia Serbia catalog of March 2026 it is a paid option, and what comes standard is the Mode 3 cable for wallboxes and public chargers. A 10 A portable charger charges at 2.3 kW, a 16 A one at 3.7 kW.
How much does it cost to install a charger for a Dacia Spring?
START is 39.000 RSD, and WALLBOX 11 kW starts at 94.000 RSD (104.000 RSD with a MID meter). The price is final and includes basic installation next to the distribution board; anything beyond that is priced after the assessment.
Sources
- Dacia Serbia — New Spring catalog (March 2026)
- Dacia Romania — press release on the new Spring (October 6, 2025)
- Dacia UK — Spring brochure (April 2026)
- Dacia Poland — New Spring brochure (charging times)
- Dacia Czechia — Spring brochure (August 2024)
- Dacia — Spring spec sheet, March 2021 (copy of the document)
- Renault Group — Dacia Spring Electric (October 15, 2020)
- EPS — electricity prices for guaranteed supply (from October 1, 2025)
- Household electricity prices in Serbia: zones, tariffs and levies (as of September 23, 2026)
- ADAC — study of charging losses on a socket and a wallbox
- Fast charging in Serbia: 43 to 79 dinars per kWh (September 22, 2026)
This page was written with the help of AI tools based on the sources listed, and the data were checked on November 16, 2026. If you spot an error or have newer data, let us know at hello@evolako.com — we publish corrections with a date.
A charger for your Dacia Spring
Send photos of the distribution board and the spot for the charger — a rough estimate from photos is free, and we reply within 48 hours.
Home charging for apartment residents — installation, MID meter and billing down to the dinar.
The iPhone and Android app is coming soon.
Let me know when it’s out →
ANDREI SMEKHOV PR NOVI SAD · Katolička porta 6/3, 21000 Novi Sad · Reg. no. 68853834 · Tax ID 116047038 · Accessibility